Contract drift detection for infrastructure projects

Contractual events, live.

Kuper reads the live project record — site diaries, correspondence, RFIs, instructions, revised drawings, programme — against your contract baseline. It connects related records into one developing contractual event and surfaces it while there is still time to act.

  • Variations
  • Notices and time bars
  • Delay and programme
  • Employer notices
Why Kuper

Margin protected in both directions.

Stop leaving entitlement on the table, and stop walking into liabilities you could have answered. Most of what gets lost on a project is lost on process, not on merits.

01 · Recover

Recover what you're owed.

Variations, extensions of time and disruption recognised, notified and substantiated while the event is still happening — not rebuilt at final account.

  • Instructions outside scope
  • Notices inside the time bar
  • Programme impact
02 · Avoid

Avoid what you'd otherwise owe.

Employer and Engineer notices answered on time, delay damages exposure watched, out-of-spec work queried before it's built.

  • Employer notices
  • Delay damages
  • Rejected work & back-charges
33.4%

of project budgets in dispute, across 2,200+ projects in 114 countries

HKA, CRUX Insight 8th Annual Report
28 days

to notify a claim under FIDIC before entitlement is at risk; some bespoke Gulf forms allow five

FIDIC; Fenwick Elliott
No. 1

cause of construction disputes: failure to properly administer the contract

Arcadis, Global Construction Disputes Report
Platform

One system, from signature to final account.

A contract manager with perfect recall, reading every document the project produces, every hour the project runs.

01 · The contract

The contract rulebook

Every notice, time bar, variation route and programme obligation, clause-linked. Particular conditions are compared with the standard form, so the five-day notice hiding where FIDIC says 28 is caught before it bites.

02 · The record

The whole project record

Project mail, the document platform, SharePoint and the programme, plus diaries, minutes, RFIs and transmittals. Kuper reads it all where it already lives. Nothing changes for the site team.

03 · Detection

Drift across the chronology

Drift rarely lives in one email. It builds across three to six documents over several weeks. Kuper reasons across the whole chronology, not message by message.

04 · Scope

Checked against the baseline

Specifications, Employer's Requirements and the drawing register are indexed, so a flag arrives with the spec clause and the baseline comparison already attached.

05 · Both sides

Both sides of the clock

Obligations owed to the contractor as well as by it: the Engineer's response periods, determinations, DAAB windows, and subcontract notices that must travel up the chain faster than they arrived.

06 · Deadlines

Live deadline register and notice drafting

Every running clock on the project in one place, with a first-draft notice citing the right sub-clause, ready for the contract manager to review and serve.

07 · The site

A channel for the site

Site teams message a project assistant by WhatsApp or email as they work. Every message is read against the contract underneath — and an instruction that may be outside scope gets a simple answer: get it in writing.

08 · Head office

Portfolio view and close-out sweep

Where entitlement is at risk across every project, and a final-account sweep of every flag never actioned, before anything is signed away.

How it works

Nothing on the project record goes unread against the contract.

Kuper is built around the life of one contractual event, not around claims. A claim is usually a variation that wasn't handled while there was still time. Money leaks at every stage, and Kuper is at every stage.

Event occurs

Site teamBuilt before a written instruction existsSite channel queries it before work starts

Recognised

Contract managerNobody spots it in the project recordRead against the contract, across the chronology

Checked against scope

Contract managerHours hunting coded spec documentsSpec, ER and baseline comparison attached

Notified

Contract managerThe time bar passes before notice goes outLive deadline register and a first-draft notice

Substantiated

QS / commercialRecords rebuilt at final accountContemporaneous record, clause-linked and dated

Priced & certified

QS / commercialSits as unbilled work in progressEach event file ready to value

Agreed & paid

Commercial directorLost on process, not on meritsPortfolio view and close-out sweep
Who it's for

One event file. Everyone who touches it.

Contract manager · daily userYour legwork done before you open the flag.

Each flag arrives as an investigation file: contract clause, spec reference and baseline comparison already attached. You confirm or dismiss.

Judged on: flag to decision · notices inside the window
Site teamKnow when you're being asked for something extra, before you build it.

A narrow check: this may be outside scope, get it in writing. Never what or how to build — that stays with the drawings and the Engineer.

Judged on: instructions queried before work starts
QS / commercial managerThe substantiation is built as the event happens.

Contemporaneous records linked to each event, ready to value — not reconstructed at final account.

Judged on: days from event to valuation
Commercial director · CFOSee the entitlement you're carrying, and how much of it is at risk of lapsing.

Open events, exposure and ageing across the portfolio.

Judged on: recovered value · time-bar misses
Evidence

When it's disputed, the file already exists.

Every event is linked to the clause, the specification, the correspondence and the decision taken — including the flags you dismissed, and why. That's the record an adjudicator, an auditor or the next contract manager inherits.

● Notice · confirmedNOT-031

Stay-cable stressing stood down: anchorage drawings late, RFI 212 open

Contract
Cl. 1.9 delayed drawings → Cl. 20.2 notice28 days from when the Contractor should have become aware
Baseline
Drawing register: DWG-P-340 Rev D due day 0Not issued by day 3; RFI 212 raised day 0
Records
Site diary D3 · correspondence D7 · RFI register D11Forwarded to the project mailbox
Decision
Confirmed by the contract manager, D8Kuper's draft notice reviewed and served with 23 days remaining
01

The record, never the people

Kuper analyses project correspondence, forwarded or shared, against the contract. It doesn't score staff or measure individual response times.

02

Flags to investigate, not verdicts

Kuper doesn't decide something is a variation. The contract manager does. A dismissable flag costs seconds; a missed event costs the entitlement.

03

The guardrail, not the ambulance

Claims are the failure mode. Commercial and contracts functions are reactive by design; Kuper gives them the event while there's still time to act on it.

What Kuper is not

It does not decide whether a claim exists. It makes sure the decision is taken while it can still be acted on. It is not a document repository, and not a general AI chat: it runs against a live project's own contract, continuously.

How Kuper is delivered
01Configure

Your contract suite becomes a rulebook, amendments and all, checked with your contracts team.

02Connect

Kuper connects to the project's mail, document platform and programme inside your environment.

03Run

Continuously, for the life of the project, through to final account.

Design partners

Partner with us.

Put Kuper on one of your live FIDIC projects and shape what it flags.